2. Installation of key parts of the concrete delivery pump: During the installation process, it is strictly forbidden to directly connect the riser to the output port of the ground pump. It is recommended to install a horizontal pipe with a length of not less than 10 meters before installing the riser to ensure that the horizontal pipe is installed in the pump and a check valve is installed.
3. If the concrete delivery pump pipe is blocked, it is recommended to stop pumping first. After checking the blocked pipe, take out the pipe and clean it, then reinstall it firmly, and then seal and clean it.
These three points are relatively basic operation methods. If a worker wants to do a good job, he must first sharpen his tools and do the basic work well, so that the building can be built high and stable. This is the truth. Secondary structure hydraulic pouring pumps are inefficient, and trying these will help.